0333 880 0182
Meet the Team

Louie Malaspina
Managing Director
+44 7432 655285

Ben Ward FSeng
(TÜV Rheinland)
Engineering Manager
+44 7475 706648

Rob Healy
​
Business Development Manager
_edited.jpg)
Janice Williams
​
HR and Contracts Manager
Case Study -
Bacton gas terminal, Norwich

Project: LM2500 Gas Turbine Control ​System Upgrade ​​
Client: RAM Power ​(In collaboration with Baker Hughes)
Scope: EC&I System Support ​​​
Completion: Commissioning & Handover successful, and completed to schedule.
Overview:
Clearline EC&I Engineering was engaged by RAM Power to provide critical support for a Baker Hughes-led LM2500 gas turbine control system upgrade. The project involved transitioning from the legacy Mark V system to the advanced Mark V*E control system to enhance operational reliability and efficiency.
​
Our Contribution:
Verified and upgraded field instrumentation to ensure compatibility with the new control system, Electrical Construction, Control System Commissioning and ATEX Inspections. ​
​
Project Coordination:
Liaised between RAM Power, Baker Hughes, and site teams to ensure seamless integration and minimal downtime. ​
​
Through our expertise in EC&I engineering, Clearline played a key role in delivering a smooth and efficient upgrade, ensuring the project was completed on schedule and met all client expectations.
Our Compliance









International EC&I problem solving
Email our experts today, at info@clearlineengineering.co.uk.